Repair of NH-58 bypass stretch to begin soon

GHAZIABAD: Repair work to strengthen the NH-58 bypass, along Hindon river – from GT Road to Raj Nagar Extension – will be undertaken soon, with Ghaziabad Development Authority (GDA), allocating Rs 50 crore for the works.

The development authority has undertaken the project since the lack of regular maintenance work on the 8km road, has rendered several stretches inaccessible for motorists. GDA officials on Thursday said the work will begin after evaluation of a technical report by the Central Road Research Institute (CRRI).

“The technical report is expected within a fortnight. CRRI has been asked to specify as to how the base of the road can be modified for better strength, before undertaking bituminous works upon it. The project includes construction of stormwater drains on either side of the road. Work on the drains, which has nothing to do with the CRRI report, will commence before the repair work,” GDA chief engineer A K Gupta told TOI.

According to GDA, the road was constructed in 2008-09 with funds made available from the central government’s urban infrastructure development scheme for small & medium towns. No major strengthening work, however, had been undertaken on the road since, though minor repair works were done from time to time.

The repair work is set to start in October. GDA has set the completion date as December 2015.

Comments are closed.